Project: | US 20, Freeport to Dubuque, 51 miles |
|
Description: | New 4-lane roadway facility on a mostly new alignment |
|
Lead Agency: | Illinois Department of Transportation |
|
Current Status: | Phase I study completed by Illinois DOT and Record of Decision issued on the environmental documents. Phase II engineering for the Galena Bypass portion of the project has been initiated. |
| |
|
Project: | US 20 Mississippi River Bridge, 1 mile |
|
Description: | Replacement of the existing 2-lane river bridge with a 4-lane structure between East Dubuque and Dubuque |
|
Lead Agency: | Iowa & Illinois Department of Transportation |
|
Current Status: | Phase I study has been initiated. |
| |
|
Project: | IA 32, SW Arterial Connector, 6 miles |
|
Description: | New arterial roadway facility to connect US 20 and US 61 in the southwest quadrant of Dubuque |
|
Lead Agency: | City of Dubuque & Dubuque County |
|
Current Status: | Phase I study has been initiated. |
| |
|
Project: | WI 11, US 51 to US 14, 3 miles |
|
Description: | Modernization and widening of urban arterial to complement growth and relieve traffic congestion along the I-39/I-90 corridor in Janesville |
|
Lead Agency: | Wisconsin Department of Transportation |
|
Current Status: | Phase I study has been initiated. |
| |
|
Project: | IL 173, IL 251 to I-39/90, 3 miles |
|
Description: | Modernization and widening of urban arterial to complement growth and relieve traffic congestion along the I-39/I-90 corridor in Machesney Park / Loves Park |
|
Lead Agency: | Illinois Department of Transportation |
|
Current Status: | Phase I & II engineering has been completed. Funding included in capital plan. |
 |
|
Project: | I-39/90 Tollway Widening, Rockton Road to Newburg Road, 14 miles |
|
Description: | Widening of the existing interstate corridor from a 4-lane to a 6-lane roadway |
|
Lead Agency: | Illinois State Toll Highway Authority |
|
Current Status: | Under construction. 2nd year of a 3-year project. 2009 completion. |
| |
|
Project: | I-39/90 Widening, IL-WI State Line to Madison, 50 miles |
|
Description: | Widening of the existing interstate corridor from a 4-lane to a 6-lane roadway |
|
Lead Agency: | Wisconsin Department of Transportation |
|
Current Status: | Phase I study has been completed. Construction timeline dependent on funding. |
| |
|
Project: | I-39/US 20 & I-90 Interchange Modernization, Cherry Valley |
|
Description: | Complete modernization and reconstruction of the interchange. |
|
Lead Agency: | Illinois State Toll Highway Authority |
|
Current Status: | Under construction. 1st year of a 2-year project. 2009 completion. |
| |
|
Project: | I-90 & Irene Road Interchange, Belvidere |
|
Description: | New interchange with I-90 as part of the Tollway Station Point / Flora Neighborhood plan, includes extension of IL 76 to connect with interchange |
|
Lead Agency: | City of Belvidere / County of Boone |
|
Current Status: | Segments are in various stages of design. Right-of-way is being purchased in the NE quadrant to allow a permanent ramp to be built that will be used as a detour during the I-39/US 20 & I-90 interchange modernization project. |
| |
|
Project: | I-30/90 & Perry Creek Parkway Interchange, Rockford |
|
Description: | New interchange with I-39/90 to provide direct access to downtown Rockford in an uncongested transportation corridor |
|
Lead Agency: | City of Rockford |
|
Current Status: | Tollway staff reviewing preliminary design concepts. Right-of-way is being reserved by adjacent land developers. |
 |
|
Project: | I-39/90 & I-43 Interchange Modernization, Beloit |
|
Description: | Complete modernization and reconstruction of the interchange plus repaving of I-43 |
|
Lead Agency: | Wisconsin Department of Transportation |
|
Current Status: | Phase I study has been completed. |
| |
|
Project: | I-88 & Jack Dame Road Interchange, Rochelle |
|
Description: | Major grade separation at the east end of Global III |
|
Lead Agency: | City of Rochelle |
|
Current Status: | Design underway. Tollway staff reviewing preliminary design concepts. |
| |
|
Project: | I-139 / Beloit and Rockford Bypass, US 20 to WI 11, Rockford, Rockton, Beloit, 14 miles |
|
Description: | New interstate highway to connect I-39 and US 20 to the western edge of the urban area, providing for the Beloit Truck By-Pass |
|
Lead Agency: | Not Determined |
|
Current Status: | Feasibility study proposal is being formulated. |
| |
|
Project: | Amtrak Service Initiation, Dubuque to Chicago, 185 miles |
|
Description: | Restoration of the “Blackhawk” line from Dubuque to Chicago Union Station |
|
Lead Agency: | Illinois DOT – Bureau of Railroads |
|
Current Status: | Rail upgrades and operating assistance in proposed Illinois capital program. |
| |
|
Project: | I-39/90 Interstate Widening, Rockton Road to the Wisconsin State Line, 3 miles |
|
Description: | Widening of the existing interstate corridor from a 4-lane to a 6-lane roadway |
|
Lead Agency: | Illinois Department of Transportation |
|
Current Status: | Construction proposed to be concurrent with the WisDOT widening project.
|